An Garda Síochána National HQ Case Study

An Garda Siochana National HQ Phoenix Park
Civic & National Infrastructure

An Garda Síochána National Headquarters, Phoenix Park, Dublin

When Ireland’s national police service required comprehensive electrical infrastructure upgrades at their central National Headquarters in Phoenix Park, Colm Construction was selected to deliver the high-security contract.

Project Challenge & Security Protocols

The facility houses 24/7 command and control operations, sensitive national intelligence databases, and senior executive offices. The project demanded:

  • Zero Allowable Downtime: All switchboard replacements and sub-mains cutovers had to occur without interrupting mission-critical police communication networks.
  • Vetting & Site Security: 100% of Colm Construction's on-site master electricians underwent stringent background checks and maintained strict compartmentalized access.
  • Historic & Modern Integration: Routing heavy containment through protected heritage fabric while meeting modern I.S. 10101:2020 fire-stopping standards.

Scope of Engineering Works

  • Sub-Distribution Switchgear: Installation of new Form 4 compartmentalized sub-distribution boards with motorized interlocks.
  • Generator Changeover Panels: Dual-feed automatic transfer switch (ATS) integration with on-site diesel backup generators.
  • Emergency Lighting (I.S. 3217): Addressable escape route lighting with central reporting head-end.
  • Heavy Containment: Galvanized steel cable tray, basket, and fire-rated trunking throughout service corridors.
  • Testing & Sign-Off: Full Safe Electric Certificate Number 3 completion and detailed O&M manuals.

"The execution by Colm Construction was delivered on programme, within budget, and with complete operational continuity for national security command teams."

Project Gallery

Switchgear Installation
Containment Infrastructure
← Back to All Projects

Project Summary

Client: An Garda Síochána / Civic Contract

Location: Phoenix Park, Dublin

Sector: Government, Police & Civic

Service: High-Security Power & Switchgear

Standard: I.S. 10101:2020 & I.S. 3217

Status: Completed on Schedule